01Approach 02Scopes
Light-Gauge Trusses & Metal Decking Cold-Formed Metal Framing Blocking & Sheathing EIFS & Plaster Gypsum Board Assemblies Acoustical Ceilings & Wall Panels Painting & Wall Coverings Specialties
03Projects 04Company 05Careers 06Contact
← All Projects
Federal · Defense

B-21 Software Integration Lab

TINKER AFB, OK · U.S. AIR FORCE · USACE
1A-210
Owner
U.S. Air ForceB-21 Program · DoD
General Contractor
BL Harbert Int'lPrime · $337.3M
Delivery
USACETulsa District
Self-Perform
Div. 05/09Framing · Drywall · Specialty
Project Overview

B-21 Software Integration Lab

Durwood is delivering interior systems for the B-21 Software Integration Lab at Tinker Air Force Base — a mission-critical facility supporting the U.S. Air Force's B-21 program software sustainment and integration.

Awarded to prime contractor BL Harbert International under the U.S. Army Corps of Engineers on a $337.3M contract, the project transforms an existing structure with new elevators, secured spaces, and conference and training areas — all built to Department of Defense UFC and antiterrorism / force-protection standards.

Beyond standard framing, drywall, and acoustical scope, the work includes unistrut and slotted-channel support systems — the structured backbone a software-integration environment runs on. Every penetration, support, and assembly is coordinated to a federal standard before it reaches the field.

Scope of Work

DIV 05
Cold-form metal framing
DIV 09
Gypsum board assemblies
DIV 09
Acoustical ceilings
SPEC
Unistrut / slotted-channel supports

Have a Project Like This on the Boards?

Request Qualifications →